{
 "name": "floodriskassessmentcost.co.uk Flood Risk Planning Rules",
 "title": "Flood Risk Planning Rules",
 "url": "https://floodriskassessmentcost.co.uk/datasets/flood-risk-planning-rules/",
 "csv": "https://floodriskassessmentcost.co.uk/datasets/flood-risk-planning-rules.csv",
 "markdown": "https://floodriskassessmentcost.co.uk/datasets/flood-risk-planning-rules/index.md",
 "computed_at": "2026-10-28",
 "license": "https://floodriskassessmentcost.co.uk/terms",
 "headline": "The Flood Risk Planning Rules carries 9 published figures read from 3 sources' own pages, from 0.10 to 3.30 percent, read 27 October 2026.",
 "quotes": [
  "The Flood Risk Planning Rules carries 9 published figures read from 3 sources' own pages, from 0.10 to 3.30 percent, read 27 October 2026.",
  "3 of the 9 named sources read in full publish a figure; 6 publish none, read 27 October 2026.",
  "Flood Risk Planning Rules, rule design-flood-river: median 1 percent across 1 source, read 27 October 2026.",
  "Flood Risk Planning Rules, rule design-flood-tidal: median 0.50 percent across 1 source, read 27 October 2026.",
  "Flood Risk Planning Rules, rule design-flood-surface-water: median 1 percent across 1 source, read 27 October 2026.",
  "Flood Risk Planning Rules, rule flood-zone-1: median 0.10 percent across 1 source, read 27 October 2026.",
  "Flood Risk Planning Rules, rule flood-zone-2: median 1 percent across 1 source, read 27 October 2026.",
  "Flood Risk Planning Rules, rule flood-zone-3a: median 1 percent across 1 source, read 27 October 2026.",
  "Flood Risk Planning Rules, rule flood-zone-3b: median 3.30 percent across 1 source, read 27 October 2026.",
  "Flood Risk Planning Rules, rule minor-extension: median 3.30 percent across 1 source, read 27 October 2026.",
  "Flood Risk Planning Rules, rule access-and-escape: median 0.10 percent across 1 source, read 27 October 2026."
 ],
 "citation": "\"floodriskassessmentcost.co.uk Flood Risk Planning Rules\", updated 2026-10-28, https://floodriskassessmentcost.co.uk/datasets/flood-risk-planning-rules/.",
 "changed_since": null,
 "national": {
  "unit": "%",
  "n": 9,
  "median": 1,
  "min": 0.1,
  "max": 3.3,
  "p25": 0.3,
  "p75": 2.15,
  "mean": 1.2556,
  "units": {
   "%": 9
  },
  "published_sources": 3,
  "named_sources": 12,
  "read_sources": 9,
  "not_published": 6,
  "published_share": 0.333
 },
 "by_axis": {
  "rule": {
   "design-flood-river": {
    "%": {
     "n": 1,
     "median": 1,
     "min": 1,
     "max": 1,
     "p25": 1,
     "p75": 1,
     "mean": 1
    }
   },
   "design-flood-tidal": {
    "%": {
     "n": 1,
     "median": 0.5,
     "min": 0.5,
     "max": 0.5,
     "p25": 0.5,
     "p75": 0.5,
     "mean": 0.5
    }
   },
   "design-flood-surface-water": {
    "%": {
     "n": 1,
     "median": 1,
     "min": 1,
     "max": 1,
     "p25": 1,
     "p75": 1,
     "mean": 1
    }
   },
   "flood-zone-1": {
    "%": {
     "n": 1,
     "median": 0.1,
     "min": 0.1,
     "max": 0.1,
     "p25": 0.1,
     "p75": 0.1,
     "mean": 0.1
    }
   },
   "flood-zone-2": {
    "%": {
     "n": 1,
     "median": 1,
     "min": 1,
     "max": 1,
     "p25": 1,
     "p75": 1,
     "mean": 1
    }
   },
   "flood-zone-3a": {
    "%": {
     "n": 1,
     "median": 1,
     "min": 1,
     "max": 1,
     "p25": 1,
     "p75": 1,
     "mean": 1
    }
   },
   "flood-zone-3b": {
    "%": {
     "n": 1,
     "median": 3.3,
     "min": 3.3,
     "max": 3.3,
     "p25": 3.3,
     "p75": 3.3,
     "mean": 3.3
    }
   },
   "minor-extension": {
    "%": {
     "n": 1,
     "median": 3.3,
     "min": 3.3,
     "max": 3.3,
     "p25": 3.3,
     "p75": 3.3,
     "mean": 3.3
    }
   },
   "access-and-escape": {
    "%": {
     "n": 1,
     "median": 0.1,
     "min": 0.1,
     "max": 0.1,
     "p25": 0.1,
     "p75": 0.1,
     "mean": 0.1
    }
   }
  }
 },
 "rows": [
  {
   "source": "Planning Practice Guidance - flood risk and coastal change",
   "url": "https://www.gov.uk/guidance/flood-risk-and-coastal-change",
   "figure": "1%",
   "value": 1,
   "unit": "%",
   "vat": null,
   "axis": {
    "rule": "design-flood-river"
   },
   "retrieved_at": "2026-10-27",
   "quote": "river flooding likely to occur with a 1% annual probability (a 1 in 100 chance each year); or",
   "source_class": "primary-government",
   "text_sha256": "fd9e16b777478312545ed94c21a457f0109e6968a245c158af4a932ab89899dd"
  },
  {
   "source": "Planning Practice Guidance - flood risk and coastal change",
   "url": "https://www.gov.uk/guidance/flood-risk-and-coastal-change",
   "figure": "0.5%",
   "value": 0.5,
   "unit": "%",
   "vat": null,
   "axis": {
    "rule": "design-flood-tidal"
   },
   "retrieved_at": "2026-10-27",
   "quote": "tidal flooding with a 0.5% annual probability (1 in 200 chance each year); or",
   "source_class": "primary-government",
   "text_sha256": "fd9e16b777478312545ed94c21a457f0109e6968a245c158af4a932ab89899dd"
  },
  {
   "source": "Planning Practice Guidance - flood risk and coastal change",
   "url": "https://www.gov.uk/guidance/flood-risk-and-coastal-change",
   "figure": "1%",
   "value": 1,
   "unit": "%",
   "vat": null,
   "axis": {
    "rule": "design-flood-surface-water"
   },
   "retrieved_at": "2026-10-27",
   "quote": "surface water flooding likely to occur with a 1% annual probability (a 1 in 100 chance each year),",
   "source_class": "primary-government",
   "text_sha256": "fd9e16b777478312545ed94c21a457f0109e6968a245c158af4a932ab89899dd"
  },
  {
   "source": "Planning Practice Guidance - flood risk and coastal change",
   "url": "https://www.gov.uk/guidance/flood-risk-and-coastal-change",
   "figure": "0.1%",
   "value": 0.1,
   "unit": "%",
   "vat": null,
   "axis": {
    "rule": "flood-zone-1"
   },
   "retrieved_at": "2026-10-27",
   "quote": "Zone 1 Low Probability Land having a less than 0.1% annual probability of river or sea flooding.",
   "source_class": "primary-government",
   "text_sha256": "fd9e16b777478312545ed94c21a457f0109e6968a245c158af4a932ab89899dd"
  },
  {
   "source": "Planning Practice Guidance - flood risk and coastal change",
   "url": "https://www.gov.uk/guidance/flood-risk-and-coastal-change",
   "figure": "1%",
   "value": 1,
   "unit": "%",
   "vat": null,
   "axis": {
    "rule": "flood-zone-2"
   },
   "retrieved_at": "2026-10-27",
   "quote": "Zone 2 Medium Probability Land having between a 1% and 0.1% annual probability of river flooding; or land having between a 0.5% and 0.1% annual probability of sea flooding.",
   "source_class": "primary-government",
   "text_sha256": "fd9e16b777478312545ed94c21a457f0109e6968a245c158af4a932ab89899dd"
  },
  {
   "source": "Planning Practice Guidance - flood risk and coastal change",
   "url": "https://www.gov.uk/guidance/flood-risk-and-coastal-change",
   "figure": "1%",
   "value": 1,
   "unit": "%",
   "vat": null,
   "axis": {
    "rule": "flood-zone-3a"
   },
   "retrieved_at": "2026-10-27",
   "quote": "Zone 3a High Probability Land having a 1% or greater annual probability of river flooding; or Land having a 0.5% or greater annual probability of sea.",
   "source_class": "primary-government",
   "text_sha256": "fd9e16b777478312545ed94c21a457f0109e6968a245c158af4a932ab89899dd"
  },
  {
   "source": "Planning Practice Guidance - flood risk and coastal change",
   "url": "https://www.gov.uk/guidance/flood-risk-and-coastal-change",
   "figure": "3.3%",
   "value": 3.3,
   "unit": "%",
   "vat": null,
   "axis": {
    "rule": "flood-zone-3b"
   },
   "retrieved_at": "2026-10-27",
   "quote": "• land having a 3.3% or greater annual probability of flooding, with any existing flood risk management infrastructure operating effectively; or",
   "source_class": "primary-government",
   "text_sha256": "fd9e16b777478312545ed94c21a457f0109e6968a245c158af4a932ab89899dd"
  },
  {
   "source": "Flood risk assessments: applying for planning permission",
   "url": "https://www.gov.uk/guidance/flood-risk-assessment-for-planning-applications",
   "figure": "3.3%",
   "value": 3.3,
   "unit": "%",
   "vat": null,
   "axis": {
    "rule": "minor-extension"
   },
   "retrieved_at": "2026-10-27",
   "quote": "present day 3.3% annual probability extent of river and sea flooding with defences",
   "source_class": "primary-government",
   "text_sha256": "3f0bd895d18d43f8cbc8a50fa4fefc469f395c938b71be74bbf443876591c4a7"
  },
  {
   "source": "Preparing a flood risk assessment: standing advice",
   "url": "https://www.gov.uk/guidance/flood-risk-assessment-standing-advice",
   "figure": "0.1%",
   "value": 0.1,
   "unit": "%",
   "vat": null,
   "axis": {
    "rule": "access-and-escape"
   },
   "retrieved_at": "2026-10-27",
   "quote": "how the development could be evacuated before an extreme flood – this is an event with a 0.1% annual probability of flooding plus an allowance for climate change",
   "source_class": "primary-government",
   "text_sha256": "bf3353532af0a70f5ebf6d7456dd31434ca6a12a412a24f12e0bd3c3233ed30c"
  }
 ],
 "not_published": [
  {
   "source": "Flood risk assessments: the sequential test for applicants",
   "url": "https://www.gov.uk/guidance/flood-risk-assessment-the-sequential-test-for-applicants",
   "retrieved_at": "2026-10-27",
   "reason": "every candidate on the page was refused"
  },
  {
   "source": "National flood risk standing advice for local planning authorities",
   "url": "https://www.gov.uk/guidance/flood-risk-assessment-local-planning-authorities",
   "retrieved_at": "2026-10-27",
   "reason": "read in full and no accepted figure on the page"
  },
  {
   "source": "Check the long term flood risk for an area",
   "url": "https://www.gov.uk/check-long-term-flood-risk",
   "retrieved_at": "2026-10-27",
   "reason": "read in full and no accepted figure on the page"
  },
  {
   "source": "NPPF chapter 14 - flooding and coastal change",
   "url": "https://www.gov.uk/guidance/national-planning-policy-framework/14-meeting-the-challenge-of-climate-change-flooding-and-coastal-change",
   "retrieved_at": "2026-10-27",
   "reason": "read in full and no accepted figure on the page"
  },
  {
   "source": "Welsh Government - TAN 15 development, flooding and coastal erosion",
   "url": "https://www.gov.wales/technical-advice-note-tan-15-development-flooding-and-coastal-erosion",
   "retrieved_at": "2026-10-27",
   "reason": "read in full and no accepted figure on the page"
  },
  {
   "source": "SEPA - planning guidance and advice notes",
   "url": "https://www.sepa.org.uk/environment/land/planning/guidance-and-advice-notes/",
   "retrieved_at": "2026-10-27",
   "reason": "read in full and no accepted figure on the page"
  }
 ],
 "sources": [
  {
   "url": "https://www.gov.uk/guidance/flood-risk-and-coastal-change",
   "label": "Planning Practice Guidance - flood risk and coastal change",
   "license": "the publisher's own terms; quoted for reporting and comment"
  },
  {
   "url": "https://www.gov.uk/guidance/flood-risk-assessment-for-planning-applications",
   "label": "Flood risk assessments: applying for planning permission",
   "license": "the publisher's own terms; quoted for reporting and comment"
  },
  {
   "url": "https://www.gov.uk/guidance/flood-risk-assessment-standing-advice",
   "label": "Preparing a flood risk assessment: standing advice",
   "license": "the publisher's own terms; quoted for reporting and comment"
  },
  {
   "url": "https://www.gov.uk/guidance/flood-risk-assessment-the-sequential-test-for-applicants",
   "label": "Flood risk assessments: the sequential test for applicants",
   "license": "the publisher's own terms; quoted for reporting and comment"
  },
  {
   "url": "https://www.gov.uk/guidance/flood-risk-assessment-local-planning-authorities",
   "label": "National flood risk standing advice for local planning authorities",
   "license": "the publisher's own terms; quoted for reporting and comment"
  },
  {
   "url": "https://flood-map-for-planning.service.gov.uk/",
   "label": "Flood map for planning",
   "license": "the publisher's own terms; quoted for reporting and comment"
  },
  {
   "url": "https://www.gov.uk/check-long-term-flood-risk",
   "label": "Check the long term flood risk for an area",
   "license": "the publisher's own terms; quoted for reporting and comment"
  },
  {
   "url": "https://www.gov.uk/government/publications/national-planning-policy-framework--2",
   "label": "National Planning Policy Framework",
   "license": "the publisher's own terms; quoted for reporting and comment"
  },
  {
   "url": "https://www.gov.uk/guidance/national-planning-policy-framework/14-meeting-the-challenge-of-climate-change-flooding-and-coastal-change",
   "label": "NPPF chapter 14 - flooding and coastal change",
   "license": "the publisher's own terms; quoted for reporting and comment"
  },
  {
   "url": "https://www.legislation.gov.uk/ukpga/2010/29/contents",
   "label": "Flood and Water Management Act 2010",
   "license": "the publisher's own terms; quoted for reporting and comment"
  },
  {
   "url": "https://www.gov.wales/technical-advice-note-tan-15-development-flooding-and-coastal-erosion",
   "label": "Welsh Government - TAN 15 development, flooding and coastal erosion",
   "license": "the publisher's own terms; quoted for reporting and comment"
  },
  {
   "url": "https://www.sepa.org.uk/environment/land/planning/guidance-and-advice-notes/",
   "label": "SEPA - planning guidance and advice notes",
   "license": "the publisher's own terms; quoted for reporting and comment"
  }
 ],
 "methodology": "Every row is a verbatim sentence read from the named source's own page through our fetch service on the date shown, hash-pinned to the stored read (the sha of the page's visible text; the raw page is mirrored to R2). 3 of the 9 named sources that could be read published a usable figure; 6 published none and are recorded as not published, never filled in; 3 could not be read (blocked, dead or unreachable) and count nowhere. The headline figures (median, minimum, maximum, quartiles) are over ONE figure per source for each breakdown it prices, in % (a source's median where its page yielded several accepted sentences for one breakdown), so a page that gives figures for several breakdowns gives one for each and N counts 9 figures, never sentences; 10 candidate sentence(s) were refused by a reviewer with the reason recorded. The fuller derivation this dataset is chartered to grow into (not yet what the figures above are; they are each source's own published figure as read): one row per rule: the trigger (flood zone, site area, development vulnerability, critical drainage area), the test it requires and the authority that applies it, per nation",
 "embed": "<figure style=\"margin:0;padding:16px;border:1px solid #d9d9d9;border-radius:8px;background:#ffffff;color:#111111;font-family:system-ui,sans-serif;max-width:480px\"><p style=\"margin:0 0 8px;font-size:28px;font-weight:700;color:#111111;background:#ffffff\">0.10 to 3.30 percent</p><p style=\"margin:0 0 8px;font-size:14px;color:#111111;background:#ffffff\">9 published figures, Flood Risk Planning Rules, across 3 sources, read 27 October 2026</p><figcaption style=\"font-size:12px;color:#444444;background:#ffffff\"><a href=\"https://floodriskassessmentcost.co.uk/datasets/flood-risk-planning-rules/#median\" style=\"color:#1a4fd6;background:#ffffff\">Source: floodriskassessmentcost.co.uk Flood Risk Planning Rules</a></figcaption></figure>"
}
